| Home News Our Company Scope of Service References Contact Imprint | |
![]() |
![]() |
| Deutsch | English | |
Our projectsNew Indian Research Base at Larsemann Hills (Antarctica) - General Planner, Construction SupervisionThe Indian National Centre for Antarctic and Ocean Research (NCAOR) was designated to realize a New Indian Research Base at Larsemann Hill, Antarctica. NCAOR organized an international competition in 2006; IMS won this competition and received the contract in November 2008.
To execute the project IMS is leading a consortium of following firms.
- IMS Ingenieurgesellschaft mbH(main consultant, coordinator and structural designer)
– m+p Consulting, Braunschweig (technical services)
– bof architekten, Hamburg (architectural rendering and interiors)
PDF download: India_General_e.pdf A 252 HafenquerspangeDefinition of the general planning boundaries, predesign and preparation of application documents for planning permit: transversal tasks and tunnel design as subcontractor of Spiekermann GmbH Floating IBA-pavillon in the Müggenburger Zollhafen (harbour)Design of three floating pontoons in modular construction, to be used as an event-/exhibition area and office space for the IBA Hamburg GmbH. One pontoon serves as a marina for boats and smaller ships. New Indian Research Base at Larsemann Hills (Antarctica) - CompetitionIMS has been asked to participate in an international competition and to submit a draft design for the new Indian research base in the Antarctica. The technical facilities and the architecture of the station have been planned by our partners m+p consulting and bof architekten.
The draft design of IMS has won the competition. Herrentunnel Lübeck B 75Examination of the technical possibilities for the independant crossing of pedestrians, cylists and mopeds through the existing Herrentunnel in Lübeck (Feasibility study) Elbe crossing of motorway A20 at GlückstadtDevelopment of a building design for a new Elbe-crossing including a feasibility study, preparation of application documents for planning permit and participation in the planning approval procedure PDF download: Elbquerung A20_MS_e.pdf Nikolai-barrageStability verification of the existing barrage by new design guidelines Design of the new German antarctica reasearch base Neumayer IIIGeneral planning (draft design, preparation of tender documents and participation in award of contract) for the new German research base as a jackable construction on the snow of the Ekström Ice Shelf west of the Atka Bay/Antarctic as a self-sustaining summer- and winter-station. PDF download: NeumayerIII_e.pdf Ems tunnel crossing of motorway A28/31 near LeerLocation of tunnel leaks and design of restoration measures. Design of a mechanical height control at the tunnel entrances. PDF download: emstu-TA_e.pdf Quai construction at Finkenwerder Vorhafen (harbour)Construction of a berth for the handling of sand as a transshipment centre from ship to van. Onshore-Windpark Kesfeld, GermanyFinal design of a gravity foundation onshore for Siemens/Bonus 2.3 MW mkII wind turbine with a hub height of 103 m near the city of Trier (Kes-feld). Final design ready for type approval. PDF download: SWP-Onshore Kesfeld_e.pdf Reconstruction Tatenberger ship-lock and dike-locklocal site supervision Gottwald Port - Containerterminal in the USA -RMG Rail Track Construction StudyFeasibility study for the foundation of fully automated rail mounted gantry cranes (RMG) on soft, cohesive, overconsolidated soil in USA (Portsmouth, Virginia) Renovation Am Radeland, former gas plant/VATPre-, Design-, Approval- and implemantation planning, prepare the documents for the public announcement to tender, participation in award of contract for Construction, Transportation and Disposal Deconstruction of pump station Neuer Hafen in Bremerhaven - HOAI Lph. 3, 4, 6 and 9Feasability study including specification on the break-off Concept, Design- and Approval planning, participation in the award of contract for the pump station break-off, development of a Concept concerning safety at work, construction supervision, technical accompany in the waste disposal, Documentation Motorway A7 - noise barrier tunnel Othmarschen/Bahrenfeld (Hamburg)Comparative study for the cost estimaton of different alternatives for noise barriers(conventional noise barrier walls, overbuilt tunnels and transparent overhead noise barriers) PDF download: Deckel-A7_eng.pdf Construction of the new floodig barrier Stadtdeich and DeichtorEnhanced local construction supervision/site management for the approximately 600m wide new flooding barrier Construction documentation Este-SperrwerkConstruction documentation - Development of a System for the existing documentation custody of the Este-Sperrwerk Tunnel crossing of the Weser (motorway A 281) near BremenComparative study bored tunnel/immersed tube for the Weser crossing as a decision support for the choice of the construction method Airport expansion Frankfurt/MainDefinition of the general design principles, draft design, plan of design and approval planning for the groundwater management of the construction pits Area enlargement of Airbus Deutschland GmbH-Werke in Hamburg-FinkenwerderWinning of a new land area to displace the southern Finkenwerder Predike Area enlargement of Airbus Deutschland GmbH-Werke in Hamburg-Finkenwerder, -Accomplishment of a Ménard Vacuum-Blocks (MVC)Necessary procedure for soil improvement, due to high loads induced by aircraft in parking position. The fulfillment was done by a vacuum block with vertical drainage of Ménard Soltaitement (MVC). dismantling of dikes at Borghorst (near Geesthacht)Pre-, Concept- and Approval planning of a technical conversion to execute an environmental action (dike-opening) Area enlargement of Airbus Deutschland GmbH-Werke in Hamburg-Finkenwerder, -Rüschhalbinsel PreportConfiguration of the pre-port for water sports installations and fishing service, transfer of the Altenwerder Fischer into the Finkenwerder Kutterhafen Area enlargement of Airbus Deutschland GmbH-Werke in Hamburg-Finkenwerder, -Rüschhalbinsel navigation illuminationRelocation and new construction of the navigation illumination: rear- and front light with viewpoint, warning lights on the dolphin, illumination of the HWS-wall and inlet illumination to the rüschhafen Storm flood protection Warnemünde/Hohe Düne - Preliminary, design, permit and phase planningPre-, Concept-, Approval- and implementation planning PDF download: SFS-Warn_Entwurf_e.pdf Master plan “JadeWeserPort” for a Deep Water Harbour for Container-Ships in WilhelmshavenCompilation of a masterplan for the overall activity, support and coordination of the individual technical departments, assistance to the plan state process
PDF download: JWP-Master_e.pdf Project Management "Borghorster Elbwiesen"Project management acticity in line with the approval documents and assistance in the plan state process PDF download: Elbwiesen_PS_e.pdf Project management Harbor train TEN-studyProject management and assistance for the project:
"Feasibility study to opitimize the railway transport connection of the hamburg harbor to Scandinavia and the Baltic sea region" Groundwater-management during the Airport Frankfurt/Main enlargement construction periodBasic Evaluation, Pre-, Concept- and Approval Planning of the groundwater management during the construction period Former used railway area in BavariaCompilation of a request to affranchise no longer used railway service areas . The Objective was to transfer this areas into municipal planning activity. Highway Tunnel RendsburgAssessment of the Design AU 4 – Solid Structure and Technical Equipment (RABT 2006)
Assessment of the overhaul – Solid structure and technical equipment for a two tube highway tunnel, length approx. 820 m (immersed tunnel, open cut and grid sections), trough section 1278 m, four-lane cross section, DTV 15,000 Kfz/d. PDF download: Rendsburg_Tu_Prfg_e.pdf Former used railway area in BavariaProject management for estate conditioning of former used railway areas im Munich, e.g. Approval Planning, Relocation of the railway property, Deconstruction of civil- and underground engineering, Tender and ínvolvement in the awarding, Coordination, Cost control, risk analysis Technical estate conditioning VivicoTechnical estate conditioning in line with the "segregation of property" for 58 properties belonging to Vivico, containing Lph.1 and 2 HOAI (Basic evaluation and Preplanning for necessary Deconstruction, relocation of not disposable railway constructions), as cost estimation Bridge Ellerholzrampe Hamburg - project managementBridge construction at the Ellerholzrampe in Hamburg: Deconstruction of the existing prestressed hollow box girder bridge and construction of a new bridge in composite construction, incl. H&S-services. Projekt management and site supervison. PDF download: br-ellerh_e.pdf Port extension scandinavia quay, LübeckDraft design, plan of design and approval planning for the port extension, HOAI-phases 1 - 4, object design and technical equipment Area enlargement of Airbus Deutschland GmbH-Werke in Hamburg-Finkenwerder, -Airstrip peninsula/New acces raod to the RüschhafenFeasability study, planning and tender procedure, involvment in the placing and site management, check of the construction detail drawings Borghorster ElbwiesenFeasability- and hydrological study, numerical simulation of ground- and surface watercourses to investigate the feasability of an environmental action (dike opening) Flood protection dyke at Billwerder – HakenConcept- and implementation planning, Tender award and construction supervision, Checkup for an new flood protection line PDF download: Haken_3_e.pdf Area enlargement of Airbus Deutschland GmbH-Werke in Hamburg-Finkenwerder, -WharfageConstruction of a wharfage including a reverse HWS-wall for the RoRo- and LoLo turnover of components for the new A380 Land reclamation in Hamburg, Airbus Deutschland GmbHTechnical Planning for the plan declaratory procedure, development of a concept and Tender procedure of a Polderclosement, flood protection wall, wharfage with RoRo-installation, Tidal outlet and pump-building, area heightening and dike construction, HWS-gate/lift- and drop gate; Inveloved in site management and check of the construction detail drawings PDF download: dasa_e.pdf Ems barrier at Gandersum with a large berth and a pumping station at Leda barrierFeasibility and plan statement documents with conceptual and detailed
design for the project and its structure, hydraulic calculations, extensive
plans for technical equipment such as mechanical, electrical and control
technology as well as formulation of tender documents and cost calculations. PDF download: Ems-Pl_e.pdf Motorway tunnel across the river Warnow in RostockCounsil to the city of Rostock, supervision and accomplishment of the plan state procedure (represantation of the Client) to the roadwork construction Warnowquerung regarding the new law concernin to highway construction and private financing in combination with the execution by the Philip Holzmann AG PDF download: WQ-HRO_e.pdf Bored road tunnel (4 lanes) beneath the Weser near DedesdorfPreliminary Planning, plan of design and approval planning including comparison bored tunnel/immersed tunnel;
Redesign of the plan of design after planning approval and preparation of tender documents/participation in tender process;
Planning, examination and consultancy during construction phase;
Participation in the preparation of the operating stage of the tunnel (instruction of the operational staff) |
|

